Nadu Nedu - 2 HM Summer Vacation 2023 Activities, Instructions

 Mana  Badi  Nadu  Nedu,   Phase-ll

Mana  Badi  Nadu  Nedu,   Phase-ll-  Ensure  that the  instructions  should  be  followed while    implementing  the program

 Government vide   reference  read  above,  accorded Administrative sanction for improving  Infrastructure  facilities  in  22,344   Schools  and  other  Educational  institutions with  a total  budget  outlay  of  Rs.8000   Crores  under  Phase  2  of  Mana  Badi  Nadu   Nedu program.

 It  is  proposed to  complete  all the  Nadu  Nedu  components  and  keep  the schools ready by 12\June  2023.  During  the  coming two months the following activities will  be started.

 I.   Roof  repairs  and  Ceiling repairs.

 II.  Supply  and  installation  of furniture. Ill. Major and  Minor Repairs.

IV.Repairs  and  completion  of Toilets.

 V.  Repairs  and  construction  of Kitchen  Sheds.

 Except    construction    of    ACRs   and    Compound    Walls   all    other    Nadu    Nedu components  are targeted  for completion  by 12th June  2023.

 The  following activities  should  be attended  to  by  all  the  Head  Masters  of  Phase-II Nadu  Nedu  Schools  to  ensure proper execution  and  completion  of Nadu  Nedu  works.

 All the CPM (central  procurement  material)  items  should be received by the  Head Master or his/her authorized representative and  two Parent Committee members. Once  the  Head  Masters  gave readiness for any  CPM material  such  material  has to be accepted,  rejection  can  be done  only  on account  of poor quality  or short supply

 Stage  wise  Ceiling  and  Roof repairs photos  must  be captured  and  uploaded to  STMS by  HM, from his/her login.

         All the Central  Procurement  items  must  be assembled and  made  ready before the re-opening of schools (i.e,  12.06.2023).

•     Centrally  procured materials  such  as Furniture, Tiles  and  Electrical  fittings  should be properly stored  and  assembly of equipment should be done  under the  personal supervision of the  Head  Master.

•     All the HMs should ensure that no or minimum discomfort is caused to students  on account of storage  of CPM material  in class  rooms.

         HMs shall  also  ensure  proper safety  and  storage  of CPM material  and  locally purchased material.

•     Failure to comply with  the  above instructions  and  any additional  cost incurred  on

 logistics  due  to negligence or non-compliance  of these  instructions  by   Head Master or his  authorized  representative,  will be recovered from their salaries, besides initiating  disciplinary  action.

 Hence, all the Regional Joint Directors, District Educational Officers should   ensure that these instructions reach  all the Head  Masters in their respective Districts and  monitor the compliance of these  instructions

Download

SSC SPOT VALUATION INSTRUCTIONS

Share This:

Post Tags:

teacherbook.in

No Comment to " Nadu Nedu - 2 HM Summer Vacation 2023 Activities, Instructions "

  • To add an Emoticons Show Icons
  • To add code Use [pre]code here[/pre]
  • To add an Image Use [img]IMAGE-URL-HERE[/img]
  • To add Youtube video just paste a video link like http://www.youtube.com/watch?v=0x_gnfpL3RM